Safety, quality and delivery
Work at height, remote sites and heavy structural components call for planning, competent people and clear records.
Delivery framework
How safe, documented work is planned
We are committed to quality, health, safety and the environment on every site.
Risk assessment
Site-specific risk assessments and method statements before work starts.
Equipped teams
Qualified technicians with climbing gear and rescue kits for work at height.
Site readiness
We will not start on a site that is unsafe or not ready.
Inspection records
Verticality, bolt torque, galvanising and earthing checked and recorded.
Clean handover
Waste removed, access restored and a snag list agreed with the client.
Quality checks
What we check before handover
- Foundations cast to the approved design and cured before loading
- Mast erected in the manufacturer's assembly sequence
- Verticality and base level verified
- All structural bolts torqued and marked
- Galvanised finish inspected for damage
- Earthing conductors and electrodes installed
- Cabinet mounted level, secured and lockable
- Keys and records handed to the client
- Site cleared and construction waste removed
- Client walkthrough and practical completion sign-off
- Snag list recorded, even if nil

Environment
Leaving sites as we found them
Construction waste is removed from site and access is restored at completion. When equipment is swapped out or masts are decommissioned, old equipment is disposed of to approved specifications and environmental requirements, with disposal certificates.
Procurement
Documents for your vendor process
If your procurement process needs company or compliance documents, tell us which ones when you enquire. Company documents are available on request.